Reference Materials

Initial Notification

The Ontario Government Notice of Study Commencement was published in the Waterloo Region Record on May 31, 2014 and the Cambridge Times on June 5, 2014 as well as the Turtle Island News and the Two Row Times on June 4, 2014. Comments are welcome throughout the study process.

Notice of Project Update

The Ontario Government Notice of Study Update was published in the Waterloo Region Record on June 17, 2017 and the Cambridge Times on June 15, 2017 as well as the Turtle Island News and the Two Row Times on June 14, 2017.

Public Information Centre

Text panels, displays and drawings shown at the PIC: PDF (12 MB)

Public Information Centre
Tuesday, November 14, 2017
4:00pm to 8:00pm
Hespeler Memorial Arena, Gallery Room
640 Ellis Rd West, Cambridge

Design and Construction Reports

Upon completion, the Design and Construction Report prepared for each phase will be available for review.

Phase 1: Design and Construction Report, 2017-12-08 (PDF, 12MB)

Transportation Environmental Study Report

The TESR from the Preliminary Design Study is provided here for your reference.